[{"data":1,"prerenderedAt":1648},["ShallowReactive",2],{"blog-post-nl-arei-reglementen-2026":3,"blog-alternates-arei-regulations-2026":383},{"id":4,"title":5,"articleId":6,"body":7,"category":355,"date":356,"description":357,"extension":358,"lastUpdated":356,"locale":359,"meta":360,"navigation":361,"path":362,"publishDate":363,"readTime":364,"refreshInterval":365,"seo":366,"slug":367,"stem":368,"tags":369,"__hash__":382},"blog\u002Fblog\u002Farei-regulations-2026.nl.md","AREI-regelgeving 2026: De Belangrijkste Wijzigingen","arei-regulations-2026",{"type":8,"value":9,"toc":339},"minimark",[10,15,24,27,31,36,39,68,77,81,88,109,112,116,119,145,149,152,178,182,189,203,211,215,226,237,240,244,296,300,303,329,332],[11,12,14],"h2",{"id":13},"overzicht-van-de-wijzigingen-2026","Overzicht van de wijzigingen 2026",[16,17,18,19,23],"p",{},"De Belgische elektrische voorschriften — bekend als het AREI (",[20,21,22],"em",{},"Algemeen Reglement op de Elektrische Installaties","), of RGIE in het Frans — worden regelmatig bijgewerkt om gelijke tred te houden met technologische vooruitgang en veiligheidseisen. De editie 2026 introduceert verschillende belangrijke wijzigingen die zowel nieuwe installaties als renovaties beïnvloeden.",[16,25,26],{},"Of u nu een huiseigenaar bent die een renovatie plant, een elektricien die aan projecten werkt, of een projectontwikkelaar — het begrijpen van deze wijzigingen is essentieel om aan de voorschriften te voldoen.",[11,28,30],{"id":29},"de-belangrijkste-wijzigingen-in-het-kort","De belangrijkste wijzigingen in het kort",[32,33,35],"h3",{"id":34},"_1-verbeterde-bescherming-voor-ev-laders","1. Verbeterde bescherming voor EV-laders",[16,37,38],{},"Met de snelle groei van elektrische voertuigen in België verscherpen de voorschriften 2026 de eisen voor laadinstallaties:",[40,41,42,50,56,62],"ul",{},[43,44,45,49],"li",{},[46,47,48],"strong",{},"Eigen kring vereist"," — Elk laadpunt moet een eigen kring hebben met passende beveiliging",[43,51,52,55],{},[46,53,54],{},"Lastbeheer"," — Installaties met meerdere laadpunten moeten intelligent lastbeheer bevatten",[43,57,58,61],{},[46,59,60],{},"Kabeldimensionering"," — Minimale kabeldoorsneden voor laadkringen zijn verhoogd",[43,63,64,67],{},[46,65,66],{},"Differentieelschakelaar Type B"," — Laadinstallaties vereisen nu Type B differentieelschakelaars (of Type A met DC-detectie)",[69,70,71],"blockquote",{},[16,72,73,76],{},[46,74,75],{},"Impact",": Als u een EV-lader installeert, reken dan op een eigen kring met passende beveiliging. Het achteraf bijwerken van een bestaande kring is niet meer aanvaardbaar.",[32,78,80],{"id":79},"_2-overspanningsbeveiliging-nu-verplicht","2. Overspanningsbeveiliging nu verplicht",[16,82,83,84,87],{},"Terwijl het voorheen slechts aanbevolen was, is overspanningsbeveiliging (SPD — Surge Protection Device) nu ",[46,85,86],{},"verplicht"," voor alle nieuwe installaties en grote renovaties:",[40,89,90,97,103,106],{},[43,91,92,93,96],{},"Minimum ",[46,94,95],{},"Type 2 SPD"," bij het hoofdverdeelbord",[43,98,99,102],{},[46,100,101],{},"Type 3 SPD"," aanbevolen voor gevoelige apparatuur",[43,104,105],{},"Moet gecoördineerd zijn met de bovenstroomse beveiligingsapparaten",[43,107,108],{},"Regelmatige controle en vervanging na activering vereist",[16,110,111],{},"Deze wijziging weerspiegelt de toenemende gevoeligheid van moderne elektronische apparatuur en het groeiende risico van spanningspieken uit het net.",[32,113,115],{"id":114},"_3-bijgewerkte-eisen-voor-zonne-installaties","3. Bijgewerkte eisen voor zonne-installaties",[16,117,118],{},"De voorschriften voor fotovoltaïsche (PV) installaties zijn verfijnd:",[40,120,121,127,133,139],{},[43,122,123,126],{},[46,124,125],{},"DC-scheidingsschakelaar"," moet bereikbaar en duidelijk gelabeld zijn",[43,128,129,132],{},[46,130,131],{},"Vlamboogdetectie"," (AFDD) wordt nu aanbevolen voor DC-kringen",[43,134,135,138],{},[46,136,137],{},"Batterijopslagsystemen"," moeten voldoen aan specifieke ventilatie- en brandveiligheidseisen",[43,140,141,144],{},[46,142,143],{},"Documentatie van bidirectionele energiemeting"," moet worden opgenomen in het installatiedossier",[32,146,148],{"id":147},"_4-strengere-regels-voor-natte-ruimtes","4. Strengere regels voor natte ruimtes",[16,150,151],{},"De classificatie van natte ruimtes (zones) en hun beveiligingseisen zijn bijgewerkt:",[40,153,154,160,166,172],{},[43,155,156,159],{},[46,157,158],{},"Zone 0"," (in het bad\u002Fde douche) — Alleen SELV-kringen (Safety Extra Low Voltage) toegestaan",[43,161,162,165],{},[46,163,164],{},"Zone 1"," (boven het bad\u002Fde douche) — Minimum IP X5 voor alle apparatuur",[43,167,168,171],{},[46,169,170],{},"Zone 2"," (0,6m rond bad\u002Fdouche) — 30mA differentieelbescherming verplicht, minimum IP X4",[43,173,174,177],{},[46,175,176],{},"Nieuwe Zone 3"," — Uitgebreid tot 2,4m rond het natte gebied, spatwaterdichte apparatuur vereist",[32,179,181],{"id":180},"_5-digitale-documentatie-aanvaard","5. Digitale documentatie aanvaard",[16,183,184,185,188],{},"Voor het eerst aanvaarden de voorschriften uitdrukkelijk ",[46,186,187],{},"digitale documentatie",":",[40,190,191,194,197,200],{},[43,192,193],{},"Eendraadschema's mogen in digitaal PDF-formaat worden ingediend",[43,195,196],{},"Situatieplannen kunnen worden gegenereerd met digitale tools (zoals PlanElec)",[43,198,199],{},"Digitale handtekeningen worden aanvaard op conformiteitsverklaringen",[43,201,202],{},"Elektronische archivering van keuringsverslagen is toegestaan",[69,204,205],{},[16,206,207,210],{},[46,208,209],{},"Goed nieuws",": Deze wijziging valideert officieel het gebruik van tools zoals PlanElec voor het aanmaken van uw elektrische documentatie.",[11,212,214],{"id":213},"wat-dit-betekent-voor-bestaande-installaties","Wat dit betekent voor bestaande installaties",[16,216,217,218,221,222,225],{},"De voorschriften 2026 zijn voornamelijk van toepassing op ",[46,219,220],{},"nieuwe installaties"," en ",[46,223,224],{},"grote renovaties",". Bestaande installaties die onder eerdere voorschriften zijn goedgekeurd, blijven geldig tot:",[40,227,228,231,234],{},[43,229,230],{},"De volgende periodieke keuring (elke 25 jaar)",[43,232,233],{},"Een belangrijke wijziging aan de installatie",[43,235,236],{},"De verkoop van het onroerend goed",[16,238,239],{},"Het wordt echter aanbevolen om uw installatie proactief bij te werken naar de nieuwe normen, vooral wat betreft overspanningsbeveiliging en eisen voor natte ruimtes.",[11,241,243],{"id":242},"tijdlijn-en-implementatie","Tijdlijn en implementatie",[245,246,247,260],"table",{},[248,249,250],"thead",{},[251,252,253,257],"tr",{},[254,255,256],"th",{},"Datum",[254,258,259],{},"Mijlpaal",[261,262,263,272,280,288],"tbody",{},[251,264,265,269],{},[266,267,268],"td",{},"Januari 2026",[266,270,271],{},"Nieuwe voorschriften gepubliceerd",[251,273,274,277],{},[266,275,276],{},"Maart 2026",[266,278,279],{},"Overgangsperiode begint",[251,281,282,285],{},[266,283,284],{},"Juni 2026",[266,286,287],{},"Volledige handhaving voor nieuwe installaties",[251,289,290,293],{},[266,291,292],{},"December 2026",[266,294,295],{},"Volledige handhaving voor grote renovaties",[11,297,299],{"id":298},"hoe-planelec-actueel-blijft","Hoe PlanElec actueel blijft",[16,301,302],{},"PlanElec wordt voortdurend bijgewerkt om de nieuwste AREI-voorschriften weer te geven:",[40,304,305,311,317,323],{},[43,306,307,310],{},[46,308,309],{},"Symbolenbibliotheek"," bijgewerkt met nieuwe componentsymbolen",[43,312,313,316],{},[46,314,315],{},"Validatieregels"," controleren conformiteit met de eisen van 2026",[43,318,319,322],{},[46,320,321],{},"Sjablonen"," bevatten nieuwe verplichte elementen (SPD, EV-kringen)",[43,324,325,328],{},[46,326,327],{},"Exportformaat"," genereert documentatie die voldoet aan de nieuwe digitale aanvaardingsnormen",[16,330,331],{},"Blijf conform zonder de volledige regelgevingstekst te hoeven bestuderen. PlanElec zorgt er automatisch voor dat uw documentatie aan de nieuwste normen voldoet.",[16,333,334],{},[335,336,338],"a",{"href":337},"\u002F","Werk uw elektrische documentatie bij met PlanElec →",{"title":340,"searchDepth":341,"depth":341,"links":342},"",2,[343,344,352,353,354],{"id":13,"depth":341,"text":14},{"id":29,"depth":341,"text":30,"children":345},[346,348,349,350,351],{"id":34,"depth":347,"text":35},3,{"id":79,"depth":347,"text":80},{"id":114,"depth":347,"text":115},{"id":147,"depth":347,"text":148},{"id":180,"depth":347,"text":181},{"id":213,"depth":341,"text":214},{"id":242,"depth":341,"text":243},{"id":298,"depth":341,"text":299},"news","2026-01-02","De laatste updates van de Belgische elektrische voorschriften en wat ze betekenen voor uw installatie.","md","nl",{},true,"\u002Fblog\u002Farei-regulations-2026.nl",null,"6 min",6,{"title":5,"description":357},"arei-reglementen-2026","blog\u002Farei-regulations-2026.nl",[370,371,372,373,374,375,376,377,378,379,380,187,381],"AREI","RGIE","regelgeving 2026","elektrische voorschriften","keuring","eendraadschema","situatieschema","overspanningsbeveiliging","EV-lader","zonnepanelen","badkamerzones","België","bYpktIPgPoqnO__eCawjwytLD0UEbJIbZdZgLgKoemg",[384,734,1077,1419],{"id":385,"title":386,"articleId":6,"body":387,"category":355,"date":356,"description":713,"extension":358,"lastUpdated":356,"locale":714,"meta":715,"navigation":361,"path":716,"publishDate":363,"readTime":364,"refreshInterval":365,"seo":717,"slug":718,"stem":719,"tags":720,"__hash__":733},"blog\u002Fblog\u002Farei-regulations-2026.de.md","AREI-Vorschriften 2026: Die wichtigsten Änderungen",{"type":8,"value":388,"toc":700},[389,393,403,406,410,414,417,443,451,455,462,483,486,490,493,519,523,526,549,553,560,574,582,586,597,608,611,615,659,663,666,692,695],[11,390,392],{"id":391},"überblick-über-die-änderungen-2026","Überblick über die Änderungen 2026",[16,394,395,396,398,399,402],{},"Die belgischen Elektrovorschriften — auf Niederländisch als AREI (",[20,397,22],{},") und auf Französisch als RGIE (",[20,400,401],{},"Règlement Général sur les Installations Électriques",") bekannt — werden regelmäßig aktualisiert, um mit dem technischen Fortschritt und den Sicherheitsanforderungen Schritt zu halten. Die Ausgabe 2026 führt mehrere wichtige Änderungen ein, die sowohl Neuinstallationen als auch Renovierungen betreffen.",[16,404,405],{},"Ob Sie als Hausbesitzer eine Renovierung planen, als Elektriker an Projekten arbeiten oder als Bauträger tätig sind — das Verständnis dieser Änderungen ist für die Einhaltung der Vorschriften unerlässlich.",[11,407,409],{"id":408},"die-wichtigsten-änderungen-im-überblick","Die wichtigsten Änderungen im Überblick",[32,411,413],{"id":412},"_1-verstärkter-schutz-für-e-auto-ladestationen","1. Verstärkter Schutz für E-Auto-Ladestationen",[16,415,416],{},"Mit der raschen Zunahme von Elektrofahrzeugen in Belgien verschärfen die Vorschriften 2026 die Anforderungen an Ladeinstallationen:",[40,418,419,425,431,437],{},[43,420,421,424],{},[46,422,423],{},"Eigener Stromkreis erforderlich"," — Jeder Ladepunkt muss einen eigenen Stromkreis mit entsprechendem Schutz haben",[43,426,427,430],{},[46,428,429],{},"Lastmanagement"," — Installationen mit mehreren Ladepunkten müssen ein intelligentes Lastmanagement enthalten",[43,432,433,436],{},[46,434,435],{},"Kabeldimensionierung"," — Mindestquerschnitte für Ladestromkreise wurden erhöht",[43,438,439,442],{},[46,440,441],{},"FI-Schutz Typ B oder Typ A-EV"," — Ladeinstallationen erfordern FI-Schutzschalter vom Typ B oder Typ A-EV (mit integrierter DC-Fehlerstromsensorik ≥ 6 mA)",[69,444,445],{},[16,446,447,450],{},[46,448,449],{},"Auswirkung",": Wenn Sie eine E-Auto-Ladestation installieren, planen Sie einen eigenen Stromkreis mit entsprechendem Schutz ein. Die Nachrüstung eines bestehenden Stromkreises ist nicht mehr zulässig.",[32,452,454],{"id":453},"_2-überspannungsschutz-jetzt-pflicht","2. Überspannungsschutz jetzt Pflicht",[16,456,457,458,461],{},"Ein Überspannungsschutz (SPD — Surge Protection Device) ist bereits seit dem AREI 2020 für alle Neuinstallationen und größeren Renovierungen ",[46,459,460],{},"Pflicht",". Die Vorschriften 2026 bekräftigen dies und konkretisieren die Anforderungen:",[40,463,464,471,477,480],{},[43,465,466,467,470],{},"Mindestens ",[46,468,469],{},"Typ 2 SPD"," am Hauptverteiler",[43,472,473,476],{},[46,474,475],{},"Typ 3 SPD"," empfohlen für empfindliche Geräte",[43,478,479],{},"Muss mit den vorgelagerten Schutzeinrichtungen koordiniert sein",[43,481,482],{},"Regelmäßige Prüfung und Austausch nach Auslösung erforderlich",[16,484,485],{},"Diese Änderung spiegelt die zunehmende Empfindlichkeit moderner elektronischer Geräte und das wachsende Risiko von Spannungsspitzen aus dem Netz wider.",[32,487,489],{"id":488},"_3-aktualisierte-anforderungen-für-solaranlagen","3. Aktualisierte Anforderungen für Solaranlagen",[16,491,492],{},"Die Vorschriften für Photovoltaik-Anlagen (PV) wurden präzisiert:",[40,494,495,501,507,513],{},[43,496,497,500],{},[46,498,499],{},"DC-Trennschalter"," muss zugänglich und deutlich gekennzeichnet sein",[43,502,503,506],{},[46,504,505],{},"Lichtbogenerkennung"," (AFDD) wird jetzt für DC-Stromkreise empfohlen",[43,508,509,512],{},[46,510,511],{},"Batteriespeichersysteme"," müssen spezifische Belüftungs- und Brandschutzanforderungen erfüllen",[43,514,515,518],{},[46,516,517],{},"Dokumentation der bidirektionalen Energiemessung"," muss in der Installationsakte enthalten sein",[32,520,522],{"id":521},"_4-strengere-regeln-für-feuchträume","4. Strengere Regeln für Feuchträume",[16,524,525],{},"Die Klassifizierung von Feuchträumen (Zonen) und deren Schutzanforderungen wurden aktualisiert:",[40,527,528,533,538,543],{},[43,529,530,532],{},[46,531,158],{}," (innerhalb der Badewanne\u002FDusche) — Nur SELV-Stromkreise (Sicherheitskleinspannung) erlaubt",[43,534,535,537],{},[46,536,164],{}," (über der Badewanne\u002FDusche) — Mindestens IPX4 in Zone 1 (IPX5 nur bei Strahlwasser\u002FHochdruckreinigung)",[43,539,540,542],{},[46,541,170],{}," (0,6m um Badewanne\u002FDusche) — 30mA FI-Schutz Pflicht, mindestens IPX4",[43,544,545,548],{},[46,546,547],{},"Bereich außerhalb der Zonen"," — Normale Installationsregeln, spritzwassergeschützte Geräte empfohlen",[32,550,552],{"id":551},"_5-digitale-dokumentation-akzeptiert","5. Digitale Dokumentation akzeptiert",[16,554,555,556,559],{},"Erstmals erkennen die Vorschriften ausdrücklich ",[46,557,558],{},"digitale Dokumentation"," an:",[40,561,562,565,568,571],{},[43,563,564],{},"Eindrahtschemas dürfen im digitalen PDF-Format eingereicht werden",[43,566,567],{},"Situationspläne können mit digitalen Werkzeugen (wie PlanElec) erstellt werden",[43,569,570],{},"Digitale Unterschriften werden auf Konformitätserklärungen akzeptiert",[43,572,573],{},"Elektronische Archivierung von Prüfberichten ist zulässig",[69,575,576],{},[16,577,578,581],{},[46,579,580],{},"Gute Nachricht",": Diese Änderung bestätigt offiziell die Verwendung von Tools wie PlanElec zur Erstellung Ihrer elektrischen Dokumentation.",[11,583,585],{"id":584},"was-das-für-bestehende-installationen-bedeutet","Was das für bestehende Installationen bedeutet",[16,587,588,589,592,593,596],{},"Die Vorschriften 2026 betreffen in erster Linie ",[46,590,591],{},"Neuinstallationen"," und ",[46,594,595],{},"größere Renovierungen",". Bestehende Installationen, die unter früheren Vorschriften geprüft wurden, bleiben gültig bis:",[40,598,599,602,605],{},[43,600,601],{},"Zur nächsten periodischen Prüfung (alle 25 Jahre)",[43,603,604],{},"Bei einer wesentlichen Änderung der Installation",[43,606,607],{},"Beim Verkauf der Immobilie",[16,609,610],{},"Es wird jedoch empfohlen, Ihre Installation proaktiv auf die neuen Standards zu aktualisieren, insbesondere hinsichtlich Überspannungsschutz und Feuchtraum-Anforderungen.",[11,612,614],{"id":613},"zeitplan-und-umsetzung","Zeitplan und Umsetzung",[245,616,617,626],{},[248,618,619],{},[251,620,621,623],{},[254,622,256],{},[254,624,625],{},"Meilenstein",[261,627,628,636,644,651],{},[251,629,630,633],{},[266,631,632],{},"Januar 2026",[266,634,635],{},"Neue Vorschriften veröffentlicht",[251,637,638,641],{},[266,639,640],{},"März 2026",[266,642,643],{},"Übergangsfrist beginnt",[251,645,646,648],{},[266,647,284],{},[266,649,650],{},"Vollständige Durchsetzung für Neuinstallationen",[251,652,653,656],{},[266,654,655],{},"Dezember 2026",[266,657,658],{},"Vollständige Durchsetzung für größere Renovierungen",[11,660,662],{"id":661},"wie-planelec-aktuell-bleibt","Wie PlanElec aktuell bleibt",[16,664,665],{},"PlanElec wird kontinuierlich aktualisiert, um die neuesten AREI\u002FRGIE-Vorschriften widerzuspiegeln:",[40,667,668,674,680,686],{},[43,669,670,673],{},[46,671,672],{},"Symbolbibliothek"," aktualisiert mit neuen Komponentensymbolen",[43,675,676,679],{},[46,677,678],{},"Validierungsregeln"," prüfen die Konformität mit den Anforderungen 2026",[43,681,682,685],{},[46,683,684],{},"Vorlagen"," enthalten neue Pflichtelemente (SPD, E-Auto-Stromkreise)",[43,687,688,691],{},[46,689,690],{},"Exportformat"," generiert Dokumentation, die den neuen digitalen Akzeptanzstandards entspricht",[16,693,694],{},"Bleiben Sie konform, ohne den vollständigen Vorschriftentext studieren zu müssen. PlanElec stellt automatisch sicher, dass Ihre Dokumentation den neuesten Standards entspricht.",[16,696,697],{},[335,698,699],{"href":337},"Aktualisieren Sie Ihre elektrische Dokumentation mit PlanElec →",{"title":340,"searchDepth":341,"depth":341,"links":701},[702,703,710,711,712],{"id":391,"depth":341,"text":392},{"id":408,"depth":341,"text":409,"children":704},[705,706,707,708,709],{"id":412,"depth":347,"text":413},{"id":453,"depth":347,"text":454},{"id":488,"depth":347,"text":489},{"id":521,"depth":347,"text":522},{"id":551,"depth":347,"text":552},{"id":584,"depth":341,"text":585},{"id":613,"depth":341,"text":614},{"id":661,"depth":341,"text":662},"Die neuesten Updates der belgischen Elektrovorschriften und was sie für Ihre Installation bedeuten.","de",{},"\u002Fblog\u002Farei-regulations-2026.de",{"title":386,"description":713},"arei-vorschriften-2026","blog\u002Farei-regulations-2026.de",[370,371,721,722,723,724,725,726,727,728,729,730,731,732],"Vorschriften 2026","Elektrovorschriften","Stromabnahme","Keuring","Eindrahtschema","Eendraadschema","Situationsplan","Überspannungsschutz","Wallbox","Solaranlage","Badezimmerzonen","Belgien","ehbQe1W8O9_XFaSsNDZFf6Aabp5qcIa4JEDLbTj1oZA",{"id":735,"title":736,"articleId":6,"body":737,"category":355,"date":356,"description":1058,"extension":358,"lastUpdated":356,"locale":1059,"meta":1060,"navigation":361,"path":1061,"publishDate":363,"readTime":364,"refreshInterval":365,"seo":1062,"slug":6,"stem":1063,"tags":1064,"__hash__":1076},"blog\u002Fblog\u002Farei-regulations-2026.en.md","AREI\u002FRGIE Regulations 2026: The Key Changes",{"type":8,"value":738,"toc":1045},[739,743,752,755,759,763,766,792,799,803,810,828,831,835,838,864,868,871,894,898,904,918,926,930,941,952,955,959,1004,1008,1011,1037,1040],[11,740,742],{"id":741},"overview-of-the-2026-updates","Overview of the 2026 Updates",[16,744,745,746,748,749,751],{},"The Belgian electrical regulations — known as AREI (",[20,747,22],{},") in Dutch and RGIE (",[20,750,401],{},") in French — receive regular updates to keep pace with technological advances and safety requirements. The 2026 edition introduces several important changes that affect both new installations and renovations.",[16,753,754],{},"Whether you're a homeowner planning a renovation, an electrician working on projects, or a property developer, understanding these changes is essential for ensuring compliance.",[11,756,758],{"id":757},"key-changes-at-a-glance","Key Changes at a Glance",[32,760,762],{"id":761},"_1-enhanced-protection-for-ev-charging","1. Enhanced Protection for EV Charging",[16,764,765],{},"With the rapid growth of electric vehicle adoption in Belgium, the 2026 regulations strengthen the requirements for EV charging installations:",[40,767,768,774,780,786],{},[43,769,770,773],{},[46,771,772],{},"Dedicated circuit required"," — Each charging point must have its own dedicated circuit with appropriate protection",[43,775,776,779],{},[46,777,778],{},"Load management"," — Installations with multiple charging points must include intelligent load management",[43,781,782,785],{},[46,783,784],{},"Cable sizing"," — Minimum cable cross-sections have been increased for charging circuits",[43,787,788,791],{},[46,789,790],{},"RCD Type B or Type A-EV"," — Charging installations require Type B or Type A-EV residual current devices (with integrated DC fault current sensing ≥ 6 mA)",[69,793,794],{},[16,795,796,798],{},[46,797,75],{},": If you're installing an EV charger, budget for a dedicated circuit with appropriate protection. Retrofitting an existing circuit is no longer acceptable.",[32,800,802],{"id":801},"_2-surge-protection-now-mandatory","2. Surge Protection Now Mandatory",[16,804,805,806,809],{},"Surge protection (SPD — Surge Protection Device) has been ",[46,807,808],{},"mandatory"," since the AREI 2020 for all new installations and major renovations. The 2026 regulations reaffirm this and specify the requirements further:",[40,811,812,817,822,825],{},[43,813,814,816],{},[46,815,95],{}," minimum at the main distribution board",[43,818,819,821],{},[46,820,101],{}," recommended for sensitive equipment",[43,823,824],{},"Must be coordinated with the upstream protection devices",[43,826,827],{},"Regular testing and replacement after activation required",[16,829,830],{},"This change reflects the increasing sensitivity of modern electronic equipment and the growing risk of voltage surges from the grid.",[32,832,834],{"id":833},"_3-updated-requirements-for-solar-installations","3. Updated Requirements for Solar Installations",[16,836,837],{},"The regulations for photovoltaic (PV) installations have been refined:",[40,839,840,846,852,858],{},[43,841,842,845],{},[46,843,844],{},"DC disconnect switch"," must be accessible and clearly labeled",[43,847,848,851],{},[46,849,850],{},"Arc fault detection"," (AFDD) is now recommended for DC circuits",[43,853,854,857],{},[46,855,856],{},"Battery storage systems"," must comply with specific ventilation and fire protection requirements",[43,859,860,863],{},[46,861,862],{},"Bidirectional energy metering"," documentation must be included in the installation file",[32,865,867],{"id":866},"_4-stricter-rules-for-wet-areas","4. Stricter Rules for Wet Areas",[16,869,870],{},"The classification of wet areas (zones) and their protection requirements have been updated:",[40,872,873,878,883,888],{},[43,874,875,877],{},[46,876,158],{}," (inside bath\u002Fshower) — Only SELV (Safety Extra Low Voltage) circuits allowed",[43,879,880,882],{},[46,881,164],{}," (above bath\u002Fshower) — Minimum IPX4 (IPX5 only when jet water\u002Fhigh-pressure cleaning is present)",[43,884,885,887],{},[46,886,170],{}," (0.6m around bath\u002Fshower) — 30mA RCD protection mandatory, minimum IPX4",[43,889,890,893],{},[46,891,892],{},"Area outside the zones"," — Normal installation rules, splash-proof equipment recommended",[32,895,897],{"id":896},"_5-digital-documentation-accepted","5. Digital Documentation Accepted",[16,899,900,901,188],{},"For the first time, the regulations explicitly accept ",[46,902,903],{},"digital documentation",[40,905,906,909,912,915],{},[43,907,908],{},"Single-line diagrams may be submitted in digital PDF format",[43,910,911],{},"Floor plans can be generated from digital tools (like PlanElec)",[43,913,914],{},"Digital signatures are accepted on compliance declarations",[43,916,917],{},"Electronic archiving of inspection reports is permitted",[69,919,920],{},[16,921,922,925],{},[46,923,924],{},"Good news",": This change officially validates the use of tools like PlanElec for creating your electrical documentation.",[11,927,929],{"id":928},"what-this-means-for-existing-installations","What This Means for Existing Installations",[16,931,932,933,936,937,940],{},"The 2026 regulations primarily affect ",[46,934,935],{},"new installations"," and ",[46,938,939],{},"major renovations",". Existing installations that passed inspection under previous regulations remain valid until:",[40,942,943,946,949],{},[43,944,945],{},"The next periodic inspection (every 25 years)",[43,947,948],{},"A major modification to the installation",[43,950,951],{},"The sale of the property",[16,953,954],{},"However, it's recommended to proactively update your installation to meet the new standards, especially regarding surge protection and wet area requirements.",[11,956,958],{"id":957},"timeline-and-implementation","Timeline and Implementation",[245,960,961,971],{},[248,962,963],{},[251,964,965,968],{},[254,966,967],{},"Date",[254,969,970],{},"Milestone",[261,972,973,981,989,997],{},[251,974,975,978],{},[266,976,977],{},"January 2026",[266,979,980],{},"New regulations published",[251,982,983,986],{},[266,984,985],{},"March 2026",[266,987,988],{},"Transition period begins",[251,990,991,994],{},[266,992,993],{},"June 2026",[266,995,996],{},"Full enforcement for new installations",[251,998,999,1001],{},[266,1000,292],{},[266,1002,1003],{},"Full enforcement for major renovations",[11,1005,1007],{"id":1006},"how-planelec-stays-current","How PlanElec Stays Current",[16,1009,1010],{},"PlanElec is continuously updated to reflect the latest AREI\u002FRGIE regulations:",[40,1012,1013,1019,1025,1031],{},[43,1014,1015,1018],{},[46,1016,1017],{},"Symbol library"," updated with new component symbols",[43,1020,1021,1024],{},[46,1022,1023],{},"Validation rules"," check compliance with 2026 requirements",[43,1026,1027,1030],{},[46,1028,1029],{},"Templates"," include new mandatory elements (SPD, EV circuits)",[43,1032,1033,1036],{},[46,1034,1035],{},"Export format"," generates documentation that meets the new digital acceptance standards",[16,1038,1039],{},"Stay compliant without having to study the full regulation text. PlanElec ensures your documentation meets the latest standards automatically.",[16,1041,1042],{},[335,1043,1044],{"href":337},"Update your electrical documentation with PlanElec →",{"title":340,"searchDepth":341,"depth":341,"links":1046},[1047,1048,1055,1056,1057],{"id":741,"depth":341,"text":742},{"id":757,"depth":341,"text":758,"children":1049},[1050,1051,1052,1053,1054],{"id":761,"depth":347,"text":762},{"id":801,"depth":347,"text":802},{"id":833,"depth":347,"text":834},{"id":866,"depth":347,"text":867},{"id":896,"depth":347,"text":897},{"id":928,"depth":341,"text":929},{"id":957,"depth":341,"text":958},{"id":1006,"depth":341,"text":1007},"The latest updates to the Belgian electrical regulations and what they mean for your installation.","en",{},"\u002Fblog\u002Farei-regulations-2026.en",{"title":736,"description":1058},"blog\u002Farei-regulations-2026.en",[370,371,1065,1066,1067,374,1068,375,725,1069,1070,1071,1072,1073,1074,1075],"regulations 2026","electrical regulations","inspection","single-line diagram","schéma unifilaire","situation plan","surge protection","EV charging","solar panels","bathroom zones","Belgium","1N5r4QSyqGaTxVnrPScx_lqRefOJnnEkd9ppDyvj5i0",{"id":1078,"title":1079,"articleId":6,"body":1080,"category":355,"date":356,"description":1401,"extension":358,"lastUpdated":356,"locale":1402,"meta":1403,"navigation":361,"path":1404,"publishDate":363,"readTime":364,"refreshInterval":365,"seo":1405,"slug":1406,"stem":1407,"tags":1408,"__hash__":1418},"blog\u002Fblog\u002Farei-regulations-2026.fr.md","Réglementation RGIE 2026 : Les Changements Clés",{"type":8,"value":1081,"toc":1388},[1082,1086,1092,1095,1099,1103,1106,1132,1139,1143,1150,1170,1173,1177,1180,1206,1210,1213,1236,1240,1247,1261,1269,1273,1284,1295,1298,1302,1347,1351,1354,1380,1383],[11,1083,1085],{"id":1084},"aperçu-des-modifications-2026","Aperçu des modifications 2026",[16,1087,1088,1089,1091],{},"Les réglementations électriques belges — connues sous le nom de RGIE (",[20,1090,401],{},"), ou AREI en néerlandais — sont régulièrement mises à jour pour suivre les avancées technologiques et les exigences de sécurité. L'édition 2026 introduit plusieurs changements importants qui affectent aussi bien les nouvelles installations que les rénovations.",[16,1093,1094],{},"Que vous soyez propriétaire planifiant une rénovation, électricien travaillant sur des projets, ou promoteur immobilier, comprendre ces changements est essentiel pour assurer la conformité.",[11,1096,1098],{"id":1097},"les-changements-clés-en-bref","Les changements clés en bref",[32,1100,1102],{"id":1101},"_1-protection-renforcée-pour-les-bornes-de-recharge-ve","1. Protection renforcée pour les bornes de recharge VE",[16,1104,1105],{},"Avec la croissance rapide des véhicules électriques en Belgique, la réglementation 2026 renforce les exigences pour les installations de recharge :",[40,1107,1108,1114,1120,1126],{},[43,1109,1110,1113],{},[46,1111,1112],{},"Circuit dédié obligatoire"," — Chaque point de charge doit avoir son propre circuit avec une protection appropriée",[43,1115,1116,1119],{},[46,1117,1118],{},"Gestion de charge"," — Les installations avec plusieurs points de charge doivent inclure une gestion intelligente de la charge",[43,1121,1122,1125],{},[46,1123,1124],{},"Dimensionnement des câbles"," — Les sections minimales des câbles pour les circuits de recharge ont été augmentées",[43,1127,1128,1131],{},[46,1129,1130],{},"Différentiel Type B"," — Les installations de recharge nécessitent désormais des différentiels de Type B (ou Type A avec détection DC)",[69,1133,1134],{},[16,1135,1136,1138],{},[46,1137,75],{}," : Si vous installez une borne de recharge VE, prévoyez un circuit dédié avec une protection appropriée. La mise à niveau d'un circuit existant n'est plus acceptable.",[32,1140,1142],{"id":1141},"_2-protection-contre-les-surtensions-désormais-obligatoire","2. Protection contre les surtensions désormais obligatoire",[16,1144,1145,1146,1149],{},"Bien que précédemment recommandée, la protection contre les surtensions (SPD — Surge Protection Device) est maintenant ",[46,1147,1148],{},"obligatoire"," pour toutes les nouvelles installations et rénovations majeures :",[40,1151,1152,1158,1164,1167],{},[43,1153,1154,1157],{},[46,1155,1156],{},"SPD Type 2"," minimum au tableau de distribution principal",[43,1159,1160,1163],{},[46,1161,1162],{},"SPD Type 3"," recommandé pour les équipements sensibles",[43,1165,1166],{},"Doit être coordonné avec les dispositifs de protection en amont",[43,1168,1169],{},"Contrôle régulier et remplacement après activation requis",[16,1171,1172],{},"Ce changement reflète la sensibilité croissante des équipements électroniques modernes et le risque grandissant de surtensions provenant du réseau.",[32,1174,1176],{"id":1175},"_3-exigences-mises-à-jour-pour-les-installations-solaires","3. Exigences mises à jour pour les installations solaires",[16,1178,1179],{},"Les réglementations pour les installations photovoltaïques (PV) ont été affinées :",[40,1181,1182,1188,1194,1200],{},[43,1183,1184,1187],{},[46,1185,1186],{},"Interrupteur-sectionneur DC"," doit être accessible et clairement étiqueté",[43,1189,1190,1193],{},[46,1191,1192],{},"Détection d'arc"," (AFDD) est désormais recommandée pour les circuits DC",[43,1195,1196,1199],{},[46,1197,1198],{},"Systèmes de stockage par batteries"," doivent respecter des exigences spécifiques de ventilation et de protection incendie",[43,1201,1202,1205],{},[46,1203,1204],{},"Documentation du comptage bidirectionnel"," doit être incluse dans le dossier d'installation",[32,1207,1209],{"id":1208},"_4-règles-plus-strictes-pour-les-pièces-humides","4. Règles plus strictes pour les pièces humides",[16,1211,1212],{},"La classification des pièces humides (zones) et leurs exigences de protection ont été mises à jour :",[40,1214,1215,1220,1225,1230],{},[43,1216,1217,1219],{},[46,1218,158],{}," (dans la baignoire\u002Fdouche) — Seuls les circuits TBTS (Très Basse Tension de Sécurité) autorisés",[43,1221,1222,1224],{},[46,1223,164],{}," (au-dessus de la baignoire\u002Fdouche) — Minimum IPX4 en zone 1 (IPX5 uniquement en cas de jets d'eau\u002Fnettoyage haute pression)",[43,1226,1227,1229],{},[46,1228,170],{}," (0,6m autour de la baignoire\u002Fdouche) — Protection différentielle 30mA obligatoire, IP X4 minimum",[43,1231,1232,1235],{},[46,1233,1234],{},"Zone en dehors des zones"," — Règles d'installation normales, équipement résistant aux éclaboussures recommandé",[32,1237,1239],{"id":1238},"_5-documentation-numérique-acceptée","5. Documentation numérique acceptée",[16,1241,1242,1243,1246],{},"Pour la première fois, la réglementation accepte explicitement la ",[46,1244,1245],{},"documentation numérique"," :",[40,1248,1249,1252,1255,1258],{},[43,1250,1251],{},"Les schémas unifilaires peuvent être soumis au format PDF numérique",[43,1253,1254],{},"Les plans de situation peuvent être générés avec des outils numériques (comme PlanElec)",[43,1256,1257],{},"Les signatures numériques sont acceptées sur les déclarations de conformité",[43,1259,1260],{},"L'archivage électronique des rapports de contrôle est autorisé",[69,1262,1263],{},[16,1264,1265,1268],{},[46,1266,1267],{},"Bonne nouvelle"," : Ce changement valide officiellement l'utilisation d'outils comme PlanElec pour la création de votre documentation électrique.",[11,1270,1272],{"id":1271},"ce-que-cela-signifie-pour-les-installations-existantes","Ce que cela signifie pour les installations existantes",[16,1274,1275,1276,1279,1280,1283],{},"La réglementation 2026 s'applique principalement aux ",[46,1277,1278],{},"nouvelles installations"," et aux ",[46,1281,1282],{},"rénovations majeures",". Les installations existantes ayant réussi le contrôle sous les réglementations précédentes restent valides jusqu'à :",[40,1285,1286,1289,1292],{},[43,1287,1288],{},"Le prochain contrôle périodique (tous les 25 ans)",[43,1290,1291],{},"Une modification majeure de l'installation",[43,1293,1294],{},"La vente du bien immobilier",[16,1296,1297],{},"Cependant, il est recommandé de mettre à jour proactivement votre installation pour répondre aux nouvelles normes, en particulier concernant la protection contre les surtensions et les exigences des pièces humides.",[11,1299,1301],{"id":1300},"calendrier-et-mise-en-œuvre","Calendrier et mise en œuvre",[245,1303,1304,1313],{},[248,1305,1306],{},[251,1307,1308,1310],{},[254,1309,967],{},[254,1311,1312],{},"Jalon",[261,1314,1315,1323,1331,1339],{},[251,1316,1317,1320],{},[266,1318,1319],{},"Janvier 2026",[266,1321,1322],{},"Nouvelles réglementations publiées",[251,1324,1325,1328],{},[266,1326,1327],{},"Mars 2026",[266,1329,1330],{},"Période de transition commence",[251,1332,1333,1336],{},[266,1334,1335],{},"Juin 2026",[266,1337,1338],{},"Application complète pour les nouvelles installations",[251,1340,1341,1344],{},[266,1342,1343],{},"Décembre 2026",[266,1345,1346],{},"Application complète pour les rénovations majeures",[11,1348,1350],{"id":1349},"comment-planelec-reste-à-jour","Comment PlanElec reste à jour",[16,1352,1353],{},"PlanElec est continuellement mis à jour pour refléter les dernières réglementations RGIE :",[40,1355,1356,1362,1368,1374],{},[43,1357,1358,1361],{},[46,1359,1360],{},"Bibliothèque de symboles"," mise à jour avec les nouveaux symboles de composants",[43,1363,1364,1367],{},[46,1365,1366],{},"Règles de validation"," vérifient la conformité avec les exigences 2026",[43,1369,1370,1373],{},[46,1371,1372],{},"Modèles"," incluent les nouveaux éléments obligatoires (SPD, circuits VE)",[43,1375,1376,1379],{},[46,1377,1378],{},"Format d'exportation"," génère une documentation conforme aux nouvelles normes d'acceptation numérique",[16,1381,1382],{},"Restez conforme sans avoir à étudier le texte réglementaire complet. PlanElec garantit automatiquement que votre documentation répond aux dernières normes.",[16,1384,1385],{},[335,1386,1387],{"href":337},"Mettez à jour votre documentation électrique avec PlanElec →",{"title":340,"searchDepth":341,"depth":341,"links":1389},[1390,1391,1398,1399,1400],{"id":1084,"depth":341,"text":1085},{"id":1097,"depth":341,"text":1098,"children":1392},[1393,1394,1395,1396,1397],{"id":1101,"depth":347,"text":1102},{"id":1141,"depth":347,"text":1142},{"id":1175,"depth":347,"text":1176},{"id":1208,"depth":347,"text":1209},{"id":1238,"depth":347,"text":1239},{"id":1271,"depth":341,"text":1272},{"id":1300,"depth":341,"text":1301},{"id":1349,"depth":341,"text":1350},"Les dernières mises à jour des réglementations électriques belges et ce qu'elles signifient pour votre installation.","fr",{},"\u002Fblog\u002Farei-regulations-2026.fr",{"title":1079,"description":1401},"reglementations-rgie-2026","blog\u002Farei-regulations-2026.fr",[370,371,1409,1410,1411,1069,375,1412,727,1413,1414,1415,1416,1417],"réglementation 2026","réglementations électriques","contrôle électrique","plan de situation","surtension","borne de recharge","panneaux solaires","salle de bain","Belgique","tbzX8CFyZHBWwLuaYTYlHo6bDFaUnabDLitR6Y5Sjmc",{"id":4,"title":5,"articleId":6,"body":1420,"category":355,"date":356,"description":357,"extension":358,"lastUpdated":356,"locale":359,"meta":1645,"navigation":361,"path":362,"publishDate":363,"readTime":364,"refreshInterval":365,"seo":1646,"slug":367,"stem":368,"tags":1647,"__hash__":382},{"type":8,"value":1421,"toc":1632},[1422,1424,1428,1430,1432,1434,1436,1454,1460,1462,1466,1480,1482,1484,1486,1504,1506,1508,1526,1528,1532,1542,1548,1550,1556,1564,1566,1568,1604,1606,1608,1626,1628],[11,1423,14],{"id":13},[16,1425,18,1426,23],{},[20,1427,22],{},[16,1429,26],{},[11,1431,30],{"id":29},[32,1433,35],{"id":34},[16,1435,38],{},[40,1437,1438,1442,1446,1450],{},[43,1439,1440,49],{},[46,1441,48],{},[43,1443,1444,55],{},[46,1445,54],{},[43,1447,1448,61],{},[46,1449,60],{},[43,1451,1452,67],{},[46,1453,66],{},[69,1455,1456],{},[16,1457,1458,76],{},[46,1459,75],{},[32,1461,80],{"id":79},[16,1463,83,1464,87],{},[46,1465,86],{},[40,1467,1468,1472,1476,1478],{},[43,1469,92,1470,96],{},[46,1471,95],{},[43,1473,1474,102],{},[46,1475,101],{},[43,1477,105],{},[43,1479,108],{},[16,1481,111],{},[32,1483,115],{"id":114},[16,1485,118],{},[40,1487,1488,1492,1496,1500],{},[43,1489,1490,126],{},[46,1491,125],{},[43,1493,1494,132],{},[46,1495,131],{},[43,1497,1498,138],{},[46,1499,137],{},[43,1501,1502,144],{},[46,1503,143],{},[32,1505,148],{"id":147},[16,1507,151],{},[40,1509,1510,1514,1518,1522],{},[43,1511,1512,159],{},[46,1513,158],{},[43,1515,1516,165],{},[46,1517,164],{},[43,1519,1520,171],{},[46,1521,170],{},[43,1523,1524,177],{},[46,1525,176],{},[32,1527,181],{"id":180},[16,1529,184,1530,188],{},[46,1531,187],{},[40,1533,1534,1536,1538,1540],{},[43,1535,193],{},[43,1537,196],{},[43,1539,199],{},[43,1541,202],{},[69,1543,1544],{},[16,1545,1546,210],{},[46,1547,209],{},[11,1549,214],{"id":213},[16,1551,217,1552,221,1554,225],{},[46,1553,220],{},[46,1555,224],{},[40,1557,1558,1560,1562],{},[43,1559,230],{},[43,1561,233],{},[43,1563,236],{},[16,1565,239],{},[11,1567,243],{"id":242},[245,1569,1570,1578],{},[248,1571,1572],{},[251,1573,1574,1576],{},[254,1575,256],{},[254,1577,259],{},[261,1579,1580,1586,1592,1598],{},[251,1581,1582,1584],{},[266,1583,268],{},[266,1585,271],{},[251,1587,1588,1590],{},[266,1589,276],{},[266,1591,279],{},[251,1593,1594,1596],{},[266,1595,284],{},[266,1597,287],{},[251,1599,1600,1602],{},[266,1601,292],{},[266,1603,295],{},[11,1605,299],{"id":298},[16,1607,302],{},[40,1609,1610,1614,1618,1622],{},[43,1611,1612,310],{},[46,1613,309],{},[43,1615,1616,316],{},[46,1617,315],{},[43,1619,1620,322],{},[46,1621,321],{},[43,1623,1624,328],{},[46,1625,327],{},[16,1627,331],{},[16,1629,1630],{},[335,1631,338],{"href":337},{"title":340,"searchDepth":341,"depth":341,"links":1633},[1634,1635,1642,1643,1644],{"id":13,"depth":341,"text":14},{"id":29,"depth":341,"text":30,"children":1636},[1637,1638,1639,1640,1641],{"id":34,"depth":347,"text":35},{"id":79,"depth":347,"text":80},{"id":114,"depth":347,"text":115},{"id":147,"depth":347,"text":148},{"id":180,"depth":347,"text":181},{"id":213,"depth":341,"text":214},{"id":242,"depth":341,"text":243},{"id":298,"depth":341,"text":299},{},{"title":5,"description":357},[370,371,372,373,374,375,376,377,378,379,380,187,381],1775151660199]